# How long should a contractor quote stay valid?

> Material prices move, your schedule fills up, and a number you threw out two months ago can quietly turn into a loser. Here is how to put an expiration date on a quote without scaring off the customer.

Source: https://toolbagcrm.com/blog/how-long-should-a-contractor-quote-stay-valid/
Author: The Toolbag Crew
Updated: 2026-11-17

Put an expiration date on every quote, short enough to protect your margin.

A quote is a promise. The day you hand it over, you’re telling the customer this is what I’ll do the work for. The trouble is the world doesn’t hold still while they think about it. Copper moves. Lumber moves. Your supplier bumps prices, your fuel bill climbs, and your calendar fills up with better-paying work. A number that made sense in March can be a loser by June.

## Why a quote needs a shelf life

A quote with no expiration date is you betting your margin that nothing changes between the day you write it and the day the customer finally says yes. It will change. The only question is whether you’re the one who eats the difference or whether you gave yourself a way out when you handed the thing over. An expiration date is that way out. It’s not you being difficult. It’s you refusing to let a six-week-old number quietly cost you.

## How long is the right window

It depends on the job. For a small, simple one where the materials are cheap and the price is steady, 30 days is plenty, and it keeps you from re-pricing the same work every week. For a bigger job that’s heavy on materials that swing around, tighten it up. Fifteen days, sometimes less when the market’s jumpy. And for a specialty part you have to special-order, your quote is only as good as your supplier’s quote to you, so match their window or beat it by a day. The rule underneath all of it is simple: the more your costs can move, the shorter you set the clock.

| Kind of job | A reasonable window |
| --- | --- |
| Small job, cheap and stable materials | 30 days |
| Big job, material-heavy or volatile prices | 15 days or less |
| Special-order part | Match your supplier's quote |
| Commercial bid with a bond or long lead time | Whatever the spec demands, in writing |

## How to word it so nobody is surprised

Put it in writing, on the quote, where they’ll actually see it. “This estimate is valid for 30 days from the date above.” That’s the whole thing. No fine-print games, no burying it. A date does two quiet jobs for you at once. It protects your pricing, and it nudges the fence-sitter off the fence. “Good through the 30th” is a gentle deadline, and deadlines move people who’d otherwise sit on your number until spring. Nobody’s offended by it, either, because every contractor they’ve ever hired does the same thing. The ones who leave the date off are usually the ones who end up eating the gap.

> A quote with no expiration date is you betting your margin that nothing changes. It will.

## When they come back after it expires

They will. Somebody sits on your quote for three months, then calls up wanting that old price like it’s still good. You’ve got a few honest moves here. Honor it, if your costs haven’t budged and you want the work. Re-quote it, if they have. Or meet in the middle and just tell them straight: materials went up since you wrote that, here’s today’s number. Most people get it. They buy groceries too, they’ve watched prices climb. The expiration date is the thing that gives you room to have that conversation without looking like you’re pulling a fast one on them.

### Putting an expiration date on your quotes

- **Set the window to the risk**: Short for volatile or material-heavy jobs, longer for cheap and stable ones.
- **Match special orders to your supplier**: Your price can only hold as long as the quote you got does.
- **Print the date on the quote**: One plain line, visible, no fine print.
- **Date and number every version**: So you know exactly what you sent and when it lapses.
- **Decide your move before they call**: Honor, re-quote, or adjust, and say which one plainly.

## Keep your quotes where you can find them

None of this works if you can’t remember what you quoted, when, or to whom. A stack of paper estimates riding around in the truck is exactly how a 45-day quote gets honored at six months by accident, or how the one that would’ve closed never gets a follow-up call. Keeping every quote in one place, with the date and the expiration right on it, is what makes any of this stick. ToolbagCRM builds quotes off your pricing catalog, stamps each one with a date, keeps every version attached to the customer, and turns the one they accept into a scheduled job and then an invoice without you re-typing a thing. You can [get started](https://app.toolbagcrm.com/signup/) free, no card needed. Founders is free the first month, then a flat base rate with unlimited users. [See plan terms, plug-in slots, and payment fees.](https://toolbagcrm.com/pricing/)

> An expiration date protects your pricing; it doesn't close the job for you. ToolbagCRM helps you build a dated quote, keep it on file, and see whether it was accepted; reading the customer and making the follow-up call are still on you.

- [How to price & quote jobs so you actually profit](https://toolbagcrm.com/blog/how-to-price-and-quote-jobs-for-profit/)
- [How to write a contractor estimate customers actually say yes to](https://toolbagcrm.com/blog/how-to-write-a-contractor-estimate-customers-say-yes-to/)
- [Good-better-best pricing: tiered options on a quote](https://toolbagcrm.com/blog/good-better-best-pricing-tiered-options-on-a-quote/)
- [How to handle change orders without losing your shirt](https://toolbagcrm.com/blog/how-to-handle-change-orders-without-losing-your-shirt/)
- [get started](https://app.toolbagcrm.com/signup/)
- [HVAC CRM](https://toolbagcrm.com/crm-for-hvac/)
- [Plumbing CRM](https://toolbagcrm.com/crm-for-plumbers/)

## Frequently asked questions

### How long should a contractor estimate be valid for?

Thirty days is a common default for small jobs with stable material costs. Tighten it to 15 days or less on big material-heavy jobs or when prices are swinging, and match your supplier's window on special-order parts.

### Do contractors have to honor an expired quote?

No. Once the validity period on the quote has passed, you are not obligated to hold that price. You can honor it, re-quote it, or adjust for what your costs have done since you wrote it.

### How do you write an expiration date on a quote?

Put a plain line on the estimate itself, such as "This estimate is valid for 30 days from the date above." Keep it visible and skip the fine print so the customer sees it before they sign.

### What should I do if a customer accepts an old expired quote?

Check whether your costs have moved. If they haven't and you want the work, honor it; if they have, tell the customer straight that materials went up and give them today's number.

## Related resources

- [How to write a contractor estimate customers actually say yes to](https://toolbagcrm.com/blog/how-to-write-a-contractor-estimate-customers-say-yes-to/)

- [Good-better-best pricing: tiered options on a quote](https://toolbagcrm.com/blog/good-better-best-pricing-tiered-options-on-a-quote/)

- [Work order vs. estimate vs. invoice: what's the difference?](https://toolbagcrm.com/blog/work-order-vs-estimate-vs-invoice-difference/)

- [Field service management software](https://toolbagcrm.com/field-service-management-software/)

- [Founders pricing](https://app.toolbagcrm.com/signup/)